River-first planning
Protected riparian buffers, ecological corridors, trails and public spaces structured around the river system.
Hakan's masterplan is designed around a clear thesis: nature as infrastructure. The site is organized around rivers within the property and a protected river-park corridor that anchors identity, resilience and long-term value.



Protected riparian buffers, ecological corridors, trails and public spaces structured around the river system.
Critical assets and buildable terraces sited outside flood-risk zones — conservative setbacks, natural drainage.
Wellness, education and CIT cluster to maximize year-round activation, walkability and operational efficiency.
Campus, residential clusters, services, conservation and infrastructure — each operated with minimal dependencies.
Multiple access points, separated construction/service routes, and pedestrian, cycling and vehicle circulation.
Water strategy, power/EV, telecom and IoT/IT-OT layers planned inside the masterplan — not added later.
Early phases validate demand through lightweight activation — programming, the Wellness MVP, CIT-lite, events, pre-leasing — before major CAPEX is committed.
Hakan's local permitting pathway is anchored in Cóbano, Puntarenas, with municipal approvals through the Concejo Municipal de Distrito de Cóbano.
National approvals include SETENA (environmental impact), CFIA (construction), MINAE (natural resources), Ministry of Health, Fire Department (Bomberos), water authorities (ASADA / AyA) and utility providers as applicable to each phase.
Permitting is integrated into the stage-gate model — G1 Diligence confirms the regulatory pathway before G2 Masterplan commits to design. No capital is deployed ahead of permit clarity.